Multi Parts Solutions

ACC Heavy Duty Names Brett Delp Sales Director as Linda Hou Retires

Image
ACC Heavy Duty Names Brett Delp Sales Director as Linda Hou Retires

Jupiter, Fla. – – October 07, 2026 -- Linda Hou, director of sales at ACC Heavy Duty, retired at the end of September 2026 after nearly 30 years in the commercial vehicle industry, with Brett Delp succeeding her in the role.

Hou exits after three decades spanning two generations of family ownership

Hou joined the family business, then known as American Chrome Company, in 1997. She left in 2001 for a seven-year run at Volvo Trucks North America as a product manager for accessories, earning an MBA from Wake Forest University in 2007 before returning to American Chrome in early 2008 to become president.

Company traces roots to a 1983 garage startup in Davenport, Iowa

Hou's parents founded American Chrome in a Davenport garage in 1983. The company became one of the original supplier partners to Alliance Parts in the 1990s, working alongside Mack Trucks, Volvo Trucks North America and Navistar International.

HKX Launches Field-Installable 3rd Spool Kits for Wheel Loaders

Image
HKX Launches Field-Installable 3rd Spool Kits for Wheel Loaders

Monroe, Wash. – September 16, 2026 -- HKX, Inc. has released its first Wheel Loader 3rd Spool Auxiliary Field Installable Kits, extending more than three decades of excavator hydraulic work into a new machine category as it targets a factory lead time of 12 to 20 weeks that has left dealers unable to quickly equip machines for attachment work.

Factory lead times of up to 20 weeks push dealers toward field-installable kits

Ordering a wheel loader with auxiliary hydraulics direct from the plant can take 12 to 20 weeks, a delay HKX says leaves dealers with few options when a customer needs a machine to run a grapple, snow blower or broom within a month. The company says its kits can be ordered and installed in a fraction of that time, allowing a dealer to reconfigure inventory already on the lot.