Skip to main content

WBI Energy

MDU Resources Greenlights $3.2B Bakken East Pipeline

Image
MDU Resources Greenlights $3.2B Bakken East Pipeline

Bismarck, N.D. – September 30, 2026 -- MDU Resources Group (NYSE: MDU) has reached a positive Final Investment Decision for its subsidiary WBI Energy to build the Bakken East Pipeline, a project estimated to cost between $2.7 billion and $3.2 billion.

Pipeline will carry 1.4 Bcf per day across 350 miles of North Dakota

The pipeline will run from the Bakken region in western North Dakota to a location near Fargo in the eastern part of the state, with an initial design capacity of 1.4 Bcf per day. The system is being engineered with flexibility to accommodate future capacity growth beyond that initial figure.