AI Infrastructure & Data Centers

Forum Markets Cuts 2026 Revenue Outlook to $8-9M, Keeps 2027 Target

Image
Forum Markets Cuts 2026 Revenue Outlook to $8-9M, Keeps 2027 Target

Palm Beach – November 12, 2026 -- Forum Markets (Nasdaq: FRMM) cut its full-year 2026 revenue guidance to $8 million-$9 million from $18 million-$22 million, while holding its 2027 revenue target at $125 million-$175 million. The company reported third-quarter net income of $7.9 million, helped by a $13.9 million non-cash gain on digital assets.

Rising GPU, equipment and financing costs delay AI compute revenue

Forum no longer expects to recognize any AI compute revenue in 2026. Prior guidance assumed initial capacity would be generating revenue in the fourth quarter. The company chose to slow deployment because of rising compute pricing, equipment costs and financing costs, which it says accelerated after the midterm elections. Fourth-quarter revenue is expected to come mainly from its commercial aircraft engine portfolio.

Bentaus Cuts GPU Power 30% While Keeping 97% of Token Output

Image
Bentaus Cuts GPU Power 30% While Keeping 97% of Token Output

RA'ANANA – November 12, 2026 -- Bentaus, an energy-first NeoCloud, cut GPU power by 30% while retaining 97% of token throughput on an AI cluster built with DriveNets networking, according to a joint announcement by the two companies.

The cluster runs AMD Instinct MI325X GPUs on DriveNets AI Fabric as the back-end network. It is managed by Bentaus Ziani Systems, which uses the GPU-FLX and CPU-FLX platforms to adjust compute power in real time. The companies describe the result as a grid-responsive, vendor-agnostic infrastructure built on open standards, aimed at maximizing tokens per watt and lowering cost per token.

Ziani software curtails power in real time without halting AI workloads

Ziani lets data centers reduce GPU and CPU power draw dynamically and return power to the grid while AI workloads keep running. Bentaus CEO and Founder Bob Davidoff said the aim is "more compute, delivered more efficiently, on power the grid can sustain."

Rafay, Fortanix Launch Confidential AI Service for Neoclouds

Image
Rafay, Fortanix Launch Confidential AI Service for Neoclouds

SUNNYVALE – November 12, 2026 -- Rafay Systems and Fortanix Inc. have launched a joint solution that lets neoclouds, sovereign AI clouds and enterprises sell confidential AI as a service, with workloads running in hardware-isolated environments where data and models stay encrypted during processing.

The Rafay Platform now orchestrates workloads on CNCF Confidential Containers (CoCo) combined with Fortanix Confidential AI. The release extends the companies' existing integration for confidential virtual machines. Support for CoCo-based deployments is available now. Fortanix announced Fortanix Confidential AI for CoCo on Oct. 19, 2026.

Gcore, TengriAI Eye 100 MW AI Data Center in Kazakhstan

Image
Gcore, TengriAI Eye 100 MW AI Data Center in Kazakhstan

Luxembourg – November 12, 2026 -- Gcore and TengriAI have signed a Memorandum of Understanding to explore a GPU data center in Kazakhstan with a target capacity of up to 100 MW, phased between 2027 and 2029.

Central Asia's thin AI compute base forces reliance on foreign capacity

Central Asia has little domestic AI compute, so organizations depend on capacity in Europe, the Gulf or East Asia, often outside regulatory jurisdiction. Gcore CEO Andre Reitenbach framed the project as a response to a question every market asks: "how do we run AI on our own terms?" The facility would put large-scale GPU infrastructure in the country, operated from the country, for customers across the region.

CIQ Pitches Modular 'AI Kit' as Idle GPUs Cost $15.6M a Month

Image
CIQ Pitches Modular 'AI Kit' as Idle GPUs Cost $15.6M a Month

Global – November 10, 2026 -- CIQ told delegates at AI Infrastructure Field Day that roughly 9,000 GPU nodes cost about $15.6 million in GPU hours for every 30 days they sat idle, according to a CIQ calculation based on one customer's deployment. The company used the figure to argue for building AI infrastructure from independent, replaceable layers instead of buying a single-vendor stack.

CIQ says AI stack layers change on one-to-three-month cycles

CIQ's presenter said every layer of the AI stack is changing at once, with some layers turning over every one to three months and hardware revised within a year. In the customer example, GPUs arrived before the rest of the data center was ready. Teams under production pressure often request a complete AI factory from one vendor, which commits them to that vendor's fixed view of the stack at one point in time.

CIQ's RLC Pro AI Loads Models 18% Faster Than Ubuntu 24.04 HWE

Image
CIQ's RLC Pro AI Loads Models 18% Faster Than Ubuntu 24.04 HWE

Global – November 10, 2026 -- CIQ says Rocky Linux from CIQ Pro AI (RLC Pro AI) deploys a GPU node in 3 minutes 44 seconds on the happy path and delivered 18% more model-loading throughput than Ubuntu 24.04 with the HWE kernel. The company presented the results at AI Infrastructure Field Day.

RLC Pro AI ships CUDA, NVIDIA drivers and tested frameworks inside the OS

The Enterprise Linux distribution bundles CUDA, the NVIDIA drivers, and frameworks such as PyTorch and Ollama, all tested together. On other distributions, CIQ says, a new GPU node means finding the right driver, compiling kernel modules, adjusting boot parameters and rebooting before a matching framework can be installed.

CIQ's Fuzzball Runs HPC and AI Inference From One YAML Workflow

Image
CIQ's Fuzzball Runs HPC and AI Inference From One YAML Workflow

Global – November 10, 2026 -- CIQ's Fuzzball orchestration software lets operators describe an HPC or AI job in one YAML file and run it across five cloud platforms and on-premises clusters, so a new workload type no longer requires a separate stack, according to a session at AI Infrastructure Field Day.

One YAML file defines compute, containers, data and job order

A Fuzzball workflow specifies the compute each job needs, the container images it runs, the data it uses and the sequence of jobs. A training job can request GPUs, and a serving job can depend on it. Deployment targets are AWS, Google Cloud, Oracle Cloud, CoreWeave and Azure, alongside on-premises clusters. Where an operator runs more than one cluster, Fuzzball places each job by cost, performance and data locality.

Alaska Launches InvestNorth Platform to Tokenize Data Center Deals

Image
Alaska Launches InvestNorth Platform to Tokenize Data Center Deals

Anchorage – November 10, 2026 -- Alaska Governor Mike Dunleavy has launched InvestNorth, a state-sponsored infrastructure financing platform built on Plural's AssetOS, alongside a new state entity, Alaska Data Corporation LLC (AKDC), to attract data center investment to the state.

AKDC will use state capital alongside private developers to site data centers

AKDC is a wholly owned subsidiary of the Alaska Industrial Development and Export Authority (AIDEA). It will work with digital infrastructure developers to site distributed data centers in communities across Alaska. Its stated aim is to keep the value of the buildout in the state. Digital infrastructure is the first target industry, funded from capital the state has set aside for technology projects statewide.

MOVIN Raises KRW 10 Billion Series A for Motion Data Push

Seoul – November 10, 2026 -- MOVIN, a LiDAR-based 3D motion data AI company backed by NAVER D2SF, has raised KRW 10 billion in a Series A round to expand from markerless motion capture into motion data infrastructure for physical AI.

IMM Investment led the round, with participation from Industrial Bank of Korea (IBK) and Voyager Ventures. Existing investors Atinum Investment, NAVER D2SF and Schmidt made follow-on investments. It is NAVER D2SF's third consecutive investment in the company, after a 2023 seed round and a 2025 pre-Series A round. That pre-Series A raised KRW 4 billion.

Hyperscale Data Offers 82% Premium in 12% Preferred Stock Exchange

Image
Hyperscale Data Offers 82% Premium in 12% Preferred Stock Exchange

Las Vegas – November 10, 2026 -- Hyperscale Data (NYSE American: GPUS) plans an exchange offer for up to 192,307,692 Class A common shares at an implied $0.26 per share, an 82% premium to the November 6 close of $0.1429.

Each 100 common shares convert into $2.00 in cash and one 12% preferred share

Holders can tender blocks of 100 shares for one unit. Each unit consists of $2.00 in cash and one preferred share with a $24.00 stated value. The preferred stock carries an annual dividend of 12.00%.

The offer requires holders to tender at least 100 million common shares.

Hyperscale Data targets a November 17 launch and a NYSE American listing for the preferred

The AI data center operator expects to launch the offer around November 17, 2026. Launch remains subject to board approval, regulatory approval and customary closing conditions. Terms will be set out in an Offer to Exchange filed with the U.S. Securities and Exchange Commission.