critical_minerals

CEM Validates Bauxite-Free Smelter-Grade Alumina Process, Launches PFS

Image
CEM Validates Bauxite-Free Smelter-Grade Alumina Process, Launches PFS

Calgary, AB – September 11, 2026 -- Canadian Energy Metals Corp. (CEM) has validated a proof of concept for producing smelter-grade alumina (SGA) from a non-bauxite resource, and has formally launched a prefeasibility study (PFS) for its Thor project in northeastern Saskatchewan, near Tisdale.

CEM's boehmite conversion process matches Bayer-process alumina purity

Testing on boehmite derived from precursors linked to high-purity alumina (HPA) and chemical-grade alumina (CGA) consistently produced samples matching the purity and technical characteristics of SGA made via the Bayer process, the current industry standard for bauxite refining. SGA is the primary feedstock for metallic aluminum production.

Lindian Signs 20-Year Rare Earth Offtake Deal With Carester

Image
Lindian Signs 20-Year Rare Earth Offtake Deal With Carester

Perth – September 09, 2026 -- Lindian Resources Limited (ASX: LIN) has signed a binding long-term offtake agreement and a technology and engineering services deal with France's Carester SAS to develop an 8,000-tonne-per-year rare earth oxide separation facility in Stepnogorsk, Kazakhstan.

Carester locks in 70% of heavy rare earth output for up to 20 years

Under the agreement, Carester will purchase 70% of Lindian's mixed heavy rare earth compound (SEGH) production and holds a right of first refusal on 70% of mixed heavy rare earth carbonate (MHREC) output from Lindian's SARECO facility. The deal runs an initial 10 years with two five-year extension options, with volumes destined for the Caremag refinery in Lacq, France.