Water Infrastructure

Arcadis Wins Friant-Kern Canal Phase 2A Management Contract

Image
Arcadis Wins Friant-Kern Canal Phase 2A Management Contract

Fresno – November 05, 2026 -- Arcadis has been selected by the Friant Water Authority to provide construction management services for phase 2A of the Friant-Kern Canal Middle Reach Capacity Correction project, for which the authority estimates construction costs of $80 million to $98 million.

Arcadis will oversee canal, utility, roadway and structural work

The consultancy will deliver construction administration and field oversight for the canal, utility, roadway and structural improvements. Phase 2A covers about 2.7 miles of new concrete-lined canal, canal tie-ins, siphons, utility relocations, roadway restoration and associated infrastructure improvements.

NJ American Water Completes $21.3M PFAS Plant Upgrade in Salem

Image
NJ American Water Completes $21.3M PFAS Plant Upgrade in Salem

Camden, N.J. – October 29, 2026 -- New Jersey American Water and Salem City have completed a $21.3 million PFAS treatment installation at the Salem Water Treatment Plant. The system can treat up to 2 million gallons of water per day and is designed to meet federal and state drinking water requirements.

Utility fast-tracked treatment after acquiring a non-compliant system

When New Jersey American Water acquired Salem's water and wastewater systems in June 2024, the water system was not meeting applicable PFAS drinking water regulations. The company fast-tracked design and construction of a permanent solution. It broke ground in Spring 2025 and placed the new treatment into service in November of that year. The final housing facility was completed in Summer 2026.

SIMFLO Wins El Salvador Municipal Water Pump Supply Contract

Image
SIMFLO Wins El Salvador Municipal Water Pump Supply Contract

Lubbock – – October 15, 2026 -- SIMFLO, the Texas-based pump maker, has been selected to supply high-efficiency vertical turbine pump bowl assemblies across all four key regions of El Salvador for municipal well construction and scheduled water system maintenance.

SIMFLO equipment will serve El Salvador's Western, Central, Eastern and San Salvador Metropolitan regions

The equipment is being distributed across Zona Occidental, the Central region, Zona Oriental and the San Salvador Metropolitan area. It will support municipal water services in various departments. The source does not disclose the contract value or the number of units.

SIMFLO supplied 1800 RPM models with stainless steel impellers for 10- to 14-inch wells

To meet specific well requirements, SIMFLO provided 1800 RPM vertical turbine models fitted with stainless steel impellers and conical strainers. The assemblies are engineered for well diameters of 10 to 14 inches.

DIPRA Promotes Horn to SVP of Research, Blount to VP of Technical Resources

Image
DIPRA Promotes Horn to SVP of Research, Blount to VP of Technical Resources

Birmingham, Ala. – September 29, 2026 -- The Ductile Iron Pipe Research Association (DIPRA) has promoted Gregg Horn to Senior Vice President of Research and Josh Blount to Vice President of Technical Resources, elevating two veteran staffers to lead the trade group's core technical operations.

Horn takes charge of research after 40 years with the association

Horn joined DIPRA in 1986 as a Regional Engineer, became Director of Regional Engineers in 1990, and served as Vice President of Technical Resources since 2013. In his new role, he will lead DIPRA's technical research efforts, Standards activities and comparative studies of substitute materials, while facilitating the Technical Committee, Environmental Subcommittee and other groups addressing research on Ductile iron pipe. He is a Life Member of the American Water Works Association (AWWA) and has served on committees within AWWA, ASCE, ASTM and ISO.