Skip to main content

Battery Energy Storage System (BESS)

LG Energy Solution BESS Wins NVIDIA DSX Ready Qualification

Image
LG Energy Solution BESS Wins NVIDIA DSX Ready Qualification

Seoul – September 21, 2026 -- LG Energy Solution said its Battery Energy Storage System (BESS) has qualified as NVIDIA DSX Ready BESS, a designation reserved for partner products meeting NVIDIA's DSX reference design requirements for AI factory power infrastructure.

Qualification targets AI data center power bottlenecks

The DSX Ready program certifies building blocks for NVIDIA's DSX AI Factory Platform, which unifies compute, networking, power, cooling, facilities and software for AI factories. LG Energy Solution's AC-coupled BESS meets NVIDIA's applicable AC energy storage requirements, addressing AI load smoothing, voltage ride-through and power reliability challenges that data center operators face when scaling capacity.