Manufacturing & Industrial Technology

SupplyOne Pitches Custom Corrugated Packaging to Cut Waste, Returns

Image
SupplyOne Pitches Custom Corrugated Packaging to Cut Waste, Returns

United States – October 29, 2026 -- SupplyOne is marketing engineering-led custom corrugated packaging that combines product protection, retail branding and supply chain services for manufacturers, distributors and e-commerce businesses.

The company's nationwide team of packaging engineers and designers covers structural concepts, prototypes, custom die-cuts, printed shipping boxes and retail-ready displays.

SupplyOne right-sizes boxes to reduce excess material and damage-related returns

Engineers align box dimensions, board grade, interior protection and structural features to cut excess materials and wasted space. SupplyOne says this can lower damage risks during handling, transportation and storage, reduce damage-related returns and improve total packaging costs across the supply chain.

Georgia-Pacific Commits $150M to Rebuild Palatka Paper Machine

Image
Georgia-Pacific Commits $150M to Rebuild Palatka Paper Machine

ATLANTA – October 29, 2026 -- Georgia-Pacific is investing approximately $150 million to rebuild a paper machine at its Palatka, Florida, mill, with completion expected in the second quarter of 2028.

Georgia-Pacific replaces the Number Four machine installed in 1980

Work on the project has already begun. The investment replaces the Number Four paper machine, which produces paper for Angel Soft bath tissue. Georgia-Pacific says the rebuild will preserve existing production while increasing the mill's manufacturing capabilities.

Updated technology and safety systems are intended to improve safety, reliability, quality and productivity.

Grupo Simec nine-month net income jumps 428% to Ps. 4.03 billion

Guadalajara – October 29, 2026 -- Grupo Simec (NYSE: SIM; BMV: SIMEC-B) lifted nine-month net income 428% to Ps. 4,028 million from Ps. 763 million a year earlier, driven by a swing in exchange results rather than operations. Operating income was almost flat at Ps. 3,800 million, and third-quarter gross margin narrowed to 21%.

Shipments rise 14% while average prices slip 4%

Net sales for the nine months ended September 30, 2026 grew 10% to Ps. 24,569 million from Ps. 22,320 million. Shipments of finished steel products reached 1.597 million tons, up from 1.400 million tons. Sales in Mexico rose 11% to Ps. 13,981 million, while sales outside Mexico gained 9% to Ps. 10,588 million.

Valmet to Report Q3 2026 Results on October 28

Espoo – – September 16, 2026 -- Valmet Oyj will publish its Interim Review for January–September 2026 on Wednesday, October 29, 2026, at approximately 9:00 a.m. Finnish time (EET), the Espoo-based process industry technology group announced.

Valmet sets October 28 release with 9:30 a.m. webcast

The stock exchange release and presentation materials will be posted on Valmet's investor relations website. A live English-language results webcast follows at 9:30 a.m. Finnish time, with a recording made available shortly afterward at the same web address.

Nucor Guides Q3 EPS to $5.55-$5.65, More Than Double Prior Year

Image
Nucor Guides Q3 EPS to $5.55-$5.65, More Than Double Prior Year

Charlotte – September 19, 2026 -- Nucor Corporation (NYSE: NUE) forecast third-quarter 2026 earnings of $5.55 to $5.65 per diluted share, more than doubling the $2.63 per share it posted in the same period of 2025.

The guidance, covering the quarter ending October 3, 2026, compares against second-quarter 2026 net earnings of $5.04 per diluted share and adjusted net earnings of $4.84 per diluted share once a one-time gain is stripped out.

Garmin Sets Oct. 28 Date for Q3 2026 Earnings Call

Image
Garmin Sets Oct. 28 Date for Q3 2026 Earnings Call

Schaffhausen, Switzerland – – September 23, 2026 -- Garmin Ltd. (NYSE: GRMN) will hold its third quarter 2026 earnings conference call on Wednesday, October 29, 2026, at 10:30 a.m. EDT, the company confirmed.

Garmin to release Q3 2026 results before market open on October 28

The earnings release will be distributed prior to the opening bell on the same day, ahead of the scheduled call with company executives.

Investors must register online to access dial-in details

Shareholders and investors seeking to join the call are required to register via the GRMN Q3 2026 Earnings Call Webcast page, after which they will receive dial-in information and a conference ID.

Live webcast will remain archived for one year

A live webcast of the call will be available through Garmin's investor relations website on the News & Events page, with an archived version accessible for twelve months following the event.

Solidion Rejects Raising Bid After Polar Power Board Turns Down Cash Offer

Image
Solidion Rejects Raising Bid After Polar Power Board Turns Down Cash Offer

Dallas – October 29, 2026 -- Solidion Technology, Inc. (NASDAQ: STI) said it will not raise its all-cash offer to acquire substantially all assets of Polar Power, Inc. (NASDAQ: POLA) after Polar's board rejected the proposal, calling the target company "severely distressed."

Solidion cites Polar's reliance on dilutive financing to justify its valuation

Polar Power established a committed equity facility on October 29, 2026 permitting the sale of up to $25 million in common stock to fund working capital. The company also raised capital through convertible notes issued August 26 that convert at the lower of 80% of the five-day volume-weighted average price or $1.00 per share if not repaid at maturity, terms Solidion said come at the expense of existing shareholders.

THOR Industries Lifts Quarterly Dividend 3.8% to $0.54 a Share

Image
THOR Industries Lifts Quarterly Dividend 3.8% to $0.54 a Share

Elkhart – October 13, 2026 -- THOR Industries, Inc. (NYSE: THO) raised its regular quarterly cash dividend 3.8% to $0.54 per share, up from $0.52, after its Board of Directors approved the increase at its October 13, 2026 meeting.

THOR sets November 10 payment date for the $0.54 dividend

The dividend is payable on November 10, 2026, to shareholders of record at the close of business on October 29, 2026. The increase adds $0.02 per share to each quarterly payment.

THOR flags inflation, tariffs, chassis supply and interest rates as key risks

In the forward-looking statements accompanying the announcement, the recreational vehicle maker cited several factors that could cause results to differ from expectations. They include the impact of inflation on product costs and consumer demand, raw material and commodity price swings including tariffs, and supply constraints on raw materials and chassis.

Integra to Auction Chicago Scenic Studios CNC and Industrial Assets

Image
Integra to Auction Chicago Scenic Studios CNC and Industrial Assets

Chicago – October 29, 2026 -- Integra Asset Solutions will sell equipment from Chicago Scenic Studios, including two CNC routers and a CNC waterjet cutter, in an online-only public auction on Tuesday, October 29, 2026, at 9:00 a.m. CT.

The assets are located at the company's facility at 955 W. Cermak Road in Chicago. Chicago Scenic Studios was founded in 1978 and grew from a design and fabrication shop serving Chicago's theater community into a scenic fabrication company serving theater, television and film, museums, corporate events and branded environments.

Industrial AI Data Platforms Should Be Judged by One Decision

Image
Industrial AI Data Platforms Should Be Judged by One Decision

Global – October 29, 2026 -- Plants selecting an industrial data platform for AI should start with a single operational decision, such as whether a reliability engineer must review a compressed-air pressure drop within an hour, rather than with a list of AI features. That decision defines the required sources, history, context, access controls and response time.

Four data sources feed the compressed-air pilot

The example pilot investigates periods when header pressure falls while compressor energy use rises. It needs PLC compressor state and control values, historian pressure, flow and power trends, IoT vibration readings, and maintenance records. None of these sources has to be replaced; the test is whether the evidence can be found, understood, governed and accessed together at the necessary time scale.